Power Shutdown on August 26 in These Areas of Chennai - Details

Home > News Shots > Tamil Nadu news
By |

The Tamil Nadu Electricity Generation and Distribution Corporation (TANGEDCO) announced that maintenance work will be undertaken in several parts of Chennai city, between 9 am and 2 pm on August 26 (Wednesday). In order to facilitate the same, power will be shut down until the work is complete.

Power Shutdown on August 26 in These Areas of Chennai - Details

The list of areas are being updated in order to help facilitate those working from home. However, if the work is completed before 2 pm then the power supply will be resumed.

The List of Areas to be affected on August 26 are as follows:

In the areas of Velachery Central: Part of Velachery Tambaram Main Road, Part of 100 Feet Taramani Link Road, Sarathy Nagar, Seetharam Nagar, SPIC Nagar, Part of 100 Feet Taramani Link Road, LIC Colony, Tansi Nagar, Dhandeeswaram Nagar.

In the areas of Avadi: Sridevi Vaishnavi Nagar, Devi Nagar, Cholan Nagar, Cholambedu Main Road, Sri Nagar Colony, Thamarai Nagar, Ganapathy Nagar, Srinivasan Nagar and J.B Nagar.

In the areas of Injambakkam: VGP Layout Part-I, Uthandi Village, Raguvaran Salai, Srinivasan Avenue, VGP Layout Part-II.

In the areas of Indira Nagar: Kasturi Bai Nagar 2nd to 5th Main Road, Nehru Nagar 1st to 4th Main Road, Dhanalakshmi Avenue, Kasturi Bai Nagar 2nd and 3rd Cross Street, Sardar Patel Road (One Part), B.V Nagar 1st and 2nd Street, Anna Avenue.

In the areas of Manali: MMDA Phase-I & II, Elanthanoor, Sadaiyankuppam, 200 Feet Road, Rajiv Gandhi Nagar, Vaikkadu Village and Sathangadu Steel Yard.

அரசியல், விளையாட்டு, நாட்டுநடப்பு, குற்ற சம்பவங்கள், வர்த்தகம், தொழில்நுட்பம், சினிமா, வாழ்க்கை முறை என பலதரப்பட்ட சுவாரஸ்யமான செய்திகளை தமிழில் படிக்க இங்கு கிளிக் செய்யவும்      

OTHER NEWS SHOTS